1
Change PowerPoint 2013 Animation Order
Change the powerpoint animation order on Slides.
© pptwork.com
Change Order of Animations for powerpoint 2013 Slides
You'll seldom find that your first assembly of animations for powerpoint Slides is the one you'll finally go with. You'll see that there needs to be an extra animation inserted between existing animations or that the presentation is more effective with a different assembly order. In general, these are easy fixes. If you want to reorient the order of a particular slide:
-
Click on the object on your slide with the animation effects that you want to reorder.
-
Go to the Animation tab, then click Animation Pane.
-
In the Animation Pane, click and hold the animation effect you want to move, then drag it to the new position. Release your mouse button and the new position is saved.
Note that a thin red line appears as you move from position. Don't release the mouse button until you see that line in the new position you want the effect to have.
If you want to insert additional animations to an initial assembly, the easiest way to do that is first to add them to the existing sequence, then (as described above), move each additional animation to the desired position in the sequence.
2
Change powerpoint 2010 Animation Order
The steps you'll take to change animation order in powerpoint 2010 are similar to those for powerpoint 2013:
- Go the Animations tab, then click on the Animation Pane button.
- Click and hold on the animation effect you want to move.
- At the bottom of the Animation Pane click you'll see "Re-Order" and up and down arrows. Click on the up or down arrow until the animation effect is in the desired position.
- Alternatively, look for the Re-Order Animation box above the Animation Pane. Click on either Move Earlier or Move Later until the animation effect is in the desired position.
- Finally, you can also use the same click, hold and drag procedure used in powerpoint 2014. Be careful, however, that the animation effect has fully reached the position you want before you release your mouse.
3
Changing Animation Order in Early Versions of powerpoint.
You can change the animation order in earlier versions of powerpoint as well. The general procedure is;
- Locate and make visible the Custom Animation task pane immediately below the home button and to the right of the preview button. (This is an on-and-off toggle)
- powerpoint 2007 users do this by clicking on the Animation Tab, then Custom Animation.
- Users of pre-2007 versions of powerpoint choose Slide Show, Custom Animation.
- Click and hold on the animation effect you want to move.
- Look for the Re-Order entry at the bottom of the Custom Animation page, then click on one of the two adjacent arrow buttons, up or down, until the effect is in the location you want.
4
Change Animation Order in powerpoint for Mac
Here are the steps you'll take to change animation order on a Mac:
-
In the View menu, select Normal
-
At the top of the Navigation pane, click Slides and then click on the slide you want to move.
-
On the Animations tab, go to Animation Options, then click Reorder.
-
Click on the up or down arrow.